Reporting and issues

How do you prove management's fix actually worked?

Validation means re-testing the fix with fresh evidence, not accepting management's word that it is done. Agree a clear close criterion when the issue is raised, then test a new sample after the fix has operated, check the root cause is addressed, and record the result.

Ola Duduyemi, CBAP, CIA · Co-founder and CEO, CoAuditor

IIA Standard 15.2: confirming the fix
1
InquireAsk management about progress
2
AssessFollow-up testing, scaled to the risk
3
UpdateRecord the status in a tracking system
Source: IIA, Global Internal Audit Standards, Standard 15.2CoAuditor

Short answer

Validation means re-testing the fix with fresh evidence, not accepting management's word that it is done. Agree a clear close criterion when the issue is raised, then test a new sample after the fix has operated, check the root cause is addressed, and record the result. Only then can the issue be closed with confidence.

Key facts

  • IIA Standard 15.2 requires internal auditors to confirm that management has implemented recommendations or action plans, using an established methodology. IIA, Global Internal Audit Standards
  • That methodology has 3 named parts: inquiring about progress, performing follow-up assessments using a risk-based approach, and updating the status of actions in a tracking system. IIA Standard 15.2
  • The extent of follow-up must consider the significance of the finding, so a high risk issue needs deeper testing than a low risk one. IIA Standard 15.2
  • An external quality assessment is required at least once every 5 years under Standard 8.4. IIA, Global Internal Audit Standards
  • From December 15, 2026, the external auditor's documentation deadline compresses from 45 days to 14 days after the report release date. PCAOB, QC 1000 postponement notice

What is issue validation, and how is it different from follow-up?

Follow-up is the whole cycle after a report: asking owners for progress, tracking dates, chasing overdue items, and reporting status. Validation is the test at the end of that cycle, for one issue, that the completed fix works.

Teams often confuse the two. They mark an issue "closed" when management says it is done, and call that follow-up. It is not validation. Validation asks: if we test this control again, with fresh evidence, does it now operate as designed?

A policy approved, a system change deployed, or a training session held is not a control operating. Only fresh evidence, after the fix has operated, proves that.

Standard 15.2 uses a risk-based approach for this reason. A low risk issue may close on inquiry plus a document. A high risk issue should only close after re-performance, with a new sample, after a period of operation.

What should a close criterion include?

A close criterion is agreed when the issue is raised, not when validation starts. Without it, closure becomes opinion, and auditor and owner will disagree about what "done" means.

Every close criterion needs four parts:

  1. What will be tested again. Name the control, population, and period.
  2. How many will be tested. Name the sample size, or state it is a full population test.
  3. What counts as a pass. Name the threshold in numbers. Example: 0 of 30 retain access after 7 days.
  4. How long the fix must have operated. Example: at least 30 days after the system link went live.

Write the criterion in the finding itself, in Corrective Action. How do you write audit findings management will actually act on? shows how, with the leavers example.

If the owner cannot agree to a measurable criterion, that is useful information. It often means the fix is not yet defined well enough to test. Pause, define the fix, then agree the criterion.

How do you choose the right validation method for the risk?

Use the rating to set the depth. Adapt sample sizes and periods to your methodology, and record the adaptation.

Risk ratingValidation methodMinimum evidence
LowInquiry plus document reviewOwner confirmation, plus the document that proves the step happened
MediumLimited re-testA small new sample, 10 to 15 items, after 30 days of operation
HighFull re-performanceA new sample of 25 to 30 items, or full population, after 30 to 90 days, with root cause checked
Regulatory or safetyRe-performance plus sustained operationAs for High, plus a second check after a further period

Two rules apply at every level. Use fresh evidence from after the fix, never evidence from before it. Test the root cause, not only the sample that failed. If the cause was a missing system link, test that the link now works for new leavers, not only that old leavers were removed.

AI can pull the new sample, match it to the system, and flag exceptions against the criterion. The auditor must still decide whether the sample is right, whether exceptions matter, and whether the issue can close.

What are the steps to validate an issue?

Follow the same steps every time, so a reviewer who was not in the room can follow the result.

  1. Confirm the fix is in place and has operated for the period in the close criterion.
  2. Draw a fresh sample, using the population and period in the criterion. Do not reuse the original sample.
  3. Re-test the control, using the same procedure as the original test. Record what you tested, item by item.
  4. Check the root cause, not only the condition. Confirm the cause itself is fixed.
  5. Decide pass or fail against the criterion, in numbers. Do not round a fail into a pass because it was "close."
  6. Record the result, with evidence attached. Link the sample, the system output, and the decision to the issue record.
  7. Close, or keep open, and report it. If it passes, close it with date and evidence. If it fails, keep it open, agree a new date, and escalate if needed.

If any step is skipped, say so in the record, and explain why. A validation with a missing step is not a validation.

What evidence counts, and what does not?

Counts as validation evidenceDoes not count on its own
A new sample, tested after the fix, with results per itemManagement's statement that the fix is done
System output showing the control operated, with datesA policy approved, with no proof it is followed
A configuration change, plus a test that it worksA project plan, or a ticket marked complete
A second sample after a further period, for high risk issuesTraining attendance, with no test after training

Evidence must show the control operating, after the fix, on new items. Anything that only shows intent, or that shows old items were fixed, is supporting evidence, not validation evidence. Keep the evidence with the issue, not in email. The 14 day clock from December 15, 2026 leaves little time for reconstruction.

  1. 1Agree

    The close criterion is set in the finding.

  2. 2FixPeople

    Management implements the action.

  3. 3Operate

    The fix runs for the agreed period.

  4. 4Re-testPeople

    The auditor tests a fresh sample against the criterion.

Pass

Close the issue, with the evidence attached.

Fail

Keep it open, agree a new date, and escalate if needed.

How do you handle a fix that fails validation?

A failed validation is useful information, not a failure of the audit. It means the fix did not address the cause, or it has not operated long enough, or the cause was misunderstood.

Do three things, in order. First, record the fail exactly as tested, with numbers. "7 of 30 leavers still retained access after 7 days" is a fact management can act on. Second, ask why, with management, and update the Cause if the evidence points to a different cause. Third, agree a new action and date, and report the fail to the CAE.

If the issue is high risk and the date has slipped, Standard 15.2 requires the auditor to obtain and document management's explanation, and to discuss it with the CAE. If senior management, by delay or inaction, has accepted a risk beyond tolerance, that goes to the board under Standard 11.5.

Do not close a failed issue because the owner tried hard, or because the next audit will look at it again. An open issue with a clear fail and a new date is honest. A closed issue with a failed test is a repeat finding waiting to happen.

What should the audit committee see?

The committee needs to know whether fixes are holding, and where risk is being accepted by delay. Report four numbers each quarter, with the same definitions every time:

MeasureWhat it shows
Issues validated as closed in the periodFixes re-tested and passed
Issues reported closed by management, not yet validatedThe validation backlog, the gap between assertion and proof
Overdue high risk issuesRisk open past its agreed date
Repeat findingsWhether fixes address root cause, or only symptoms

The second number is the most important. It is the closure gap: the difference between what management reports as closed and what audit has validated. A large gap means the function is reporting progress it has not yet proved.

What is the honest limit?

Validation proves a control operated in the period tested, on the sample tested. It does not prove it will operate forever. A control can pass validation and fail next month if the process changes, the owner leaves, or the system is updated. Present validation as a point in time test, and do not overclaim it.

How CoAuditor helps

CoAuditor keeps each issue, its close criterion, its owner, its due date, and its validation evidence in one trail, with Agentic AI assembling the fresh sample and the evidence while auditors own the re-test, the judgment, and the decision to close.

Sources

Frequently asked questions

Can we close an issue on management's confirmation alone?
For a low risk issue, inquiry plus a supporting document may be enough, if your methodology allows it. For medium and high risk issues, no. Closure needs fresh evidence from a re-test.
How long should a fix operate before we validate it?
Long enough to produce a meaningful new sample. As a guide, at least 30 days for most controls, and 30 to 90 days for high risk controls. Agree the period in the close criterion.
What if the fix works, but the root cause was different?
Record what the re-test actually proved, and update the Cause if the evidence supports a different cause. Do not close on a fix that addressed a different cause without recording that change.
Who decides whether an issue can close?
Internal audit decides, on examined evidence. Management owns implementation. Audit owns the validation conclusion. That separation is the point of Standard 15.2.
What if management accepts the risk and will not fix it?
Record the acceptance, with the name of the person who accepted it and the date. Report it to the CAE, and if the risk is beyond tolerance, to senior management and the board under Standard 11.5.

Watch the 3-minute film

How internal audit keeps pace with AI-era risk, and what MJ does in a real audit, start to finish.

About the author

Ola Duduyemi

Ola Duduyemi is the co-founder and CEO of CoAuditor, a Certified Business Analysis Professional (CBAP) and a member of the IIA Toronto Chapter. Ola studied economics and built a career in internal audit.

Your seat is waiting.

Speak on our shows, bring an outside view, co-author an article or open doors. Pick a program:

See MJ work on your own audit in 30 minutes.