Controls testing

How can we cut SOX testing time without cutting quality?

SOX testing time is cut by scoping to risk, testing full populations where that fits, tightening review control precision, and fixing the evidence trail, not by shrinking samples or skipping steps.

Ola Duduyemi, CBAP, CIA · Co-founder and CEO, CoAuditor

Integrated audits with at least one ICFR deficiency
2024 inspections27%
2025 inspections14%
Source: PCAOB, Staff Update on 2025 Inspections (estimates)CoAuditor

Short answer

Cut SOX testing time by removing work that does not prove anything, not by removing proof. Scope to controls that matter for material misstatement, test full populations where system data allows it, define review control precision before testing, and keep evidence and deficiency decisions in one trail.

Key facts

  • The PCAOB staff update on 2025 inspections, published October 22, 2026, reported that the share of integrated audits with at least one ICFR deficiency fell from 27% to 14%, while the recurring problem areas stayed the same: controls with a review element, identifying and selecting controls to test, and evaluating identified deficiencies. PCAOB Staff Update on 2025 Inspections
  • In the PCAOB 2025 inspection cycle, staff inspected 143 firms and reviewed portions of 780 public company audits, mostly for fiscal years ending in 2024. The 2025 figures are estimates because some inspection reports were not yet final. Thomson Reuters, PCAOB 2025 inspections
  • Under PCAOB AS 2201, the auditor must obtain evidence about design and operating effectiveness, and a material weakness in ICFR means an adverse opinion on ICFR. The standard sets out how deficiencies are evaluated on magnitude and likelihood, including indicators of a material weakness. PCAOB AS 2201
  • From December 15, 2026, the external auditor documentation completion deadline under AS 1215 compresses from 45 days to 14 days after the report release date, which shortens the window for handing over workpapers and closing open items after year end. PCAOB, QC 1000 postponement and related amendments
  • One CoAuditor manufacturing customer completed six audits in one month with no new headcount, work that would have cost more than 300,000 dollars in outsourcing. That is one customer outcome, not a guarantee of time saved for any other team. CoAuditor customer outcome, verified

Why does SOX testing take so long?

It takes long for reasons that feel like testing, but are not testing.

The first reason is scope creep. The control list grows every year and rarely shrinks. A control added for a one off issue stays. A control for a process that changed stays, even though the risk moved. A control that duplicates another control stays, because no one wants to be the person who removed it. Each extra control adds design work, sample work, review work, and follow up work, for a risk that may no longer exist.

The second reason is rework. The test is done, then the reviewer asks for the population, the evidence, or the exception follow up, and the auditor has to reconstruct it. The external auditor asks the same questions again, in a different form. The file was complete enough to finish the test and not complete enough for someone else to follow it. That gap is paid for twice.

The third reason is waiting. Evidence is requested by email, arrives in a shared drive, is clarified in a chat, and is filed in a fourth place. Status is assembled for a meeting instead of read from the work. Action plans live in a report, then in a spreadsheet, then in an inbox. Waiting is not testing, but it fills the calendar.

The fourth reason is sampling by habit. A team picks the same sample size for every control, tests items by hand that a system could test in full, and spends the week pulling samples instead of judging exceptions. Sampling is necessary for many manual controls. It is wasteful where the population is already in a system and the attributes are clear.

None of these reasons is about auditors working slowly. They are about a workflow that makes the same work harder than it needs to be. Cutting time, then, is not about working faster at the same steps. It is about removing steps that do not prove anything, and doing the steps that do prove something once, in a form that can be reused.

What does quality mean in SOX testing?

Quality in SOX testing has a specific meaning, and it is worth stating before any discussion of speed.

A quality SOX test can answer four questions from the file alone, without calling the auditor who did the work.

First, what control was tested, and what risk does it address? Second, what population was tested, and how were items selected? Third, what evidence supports each item, and what was found? Fourth, what judgment was made about deviations, and who made it?

If the file answers those four, the test is usable by a reviewer, by an external auditor, and by a future auditor testing the same control next year. If it does not, the test may have been done well and still be unusable, because usability is part of quality, not an extra.

The PCAOB inspection results point in the same direction. The overall deficiency rate fell, from 27% to 14% for ICFR in integrated audits, which shows that testing is improving. The recurring themes did not change: review controls, control selection, and deficiency evaluation. Those three are not about effort. They are about precision, scoping, and judgment. A team that fixes those three will save time as a side effect, because the work that causes rework is the work that is imprecise, poorly scoped, or unevaluated.

Quality also means knowing what you did not test. A SOX program that claims coverage it does not have is weaker than one that states its limits plainly. The committee needs to hear what was tested, what was not, and why. That honesty is what makes the conclusion trustworthy.

Where does time actually go in a SOX cycle?

Before you cut anything, map where the hours go. Most teams are surprised by the split. Testing itself is often less than half the cycle. The rest is preparation, chasing, review, and remediation follow up.

PhaseWhat it includesWhere time leaks
Scoping and planningRisk assessment, control selection, walkthroughsControls carried forward without rechecking risk, walkthroughs repeated from scratch each year
Evidence collectionRequests, reminders, uploads, clarificationsEmail threads, shared drives, missing versions, unclear requests
TestingDesign tests, operating tests, samplingManual testing of populations a system could test in full, sample sizes set by habit
ReviewManager review, quality review, external auditor reviewFiles that need reconstruction, unclear deviation decisions, missing populations
Deficiency and remediationEvaluation, reporting, action plans, retestingAction plans with no owner or close criterion, retesting that repeats the original test
ReportingManagement assessment, committee reportingStatus assembled for meetings, findings drafted late, after fieldwork

Use that table as a diagnostic. For one cycle, note which row caused the most delay, not the most hours. Delay is often in evidence collection and review, even when testing took the most hours. Cutting testing hours while leaving the delay in place will not move the year end date. Cutting the delay will.

A practical way to do the diagnostic is to pick five controls that were late last cycle and trace each one back to the row where it stalled. If three of the five stalled on evidence, the fix is in evidence workflow, not in sample size. If three stalled on review, the fix is in the file standard, not in testing speed.

What are the seven levers that save time without cutting quality?

These levers are ordered by impact for most teams, starting with scoping, because scoping decides how much work exists at all.

Lever 1: Scope to risk, and retire controls that no longer earn their place

Start with the control list. For each control, ask three questions. What misstatement does it prevent or detect? How material is that misstatement? Is there another control that already covers it?

If a control has no clear misstatement, retire it or move it out of the SOX program. If two controls cover the same risk, keep the one with the clearer evidence trail and retire the duplicate, with the reasoning documented. If a process changed and the risk moved, update the control to the new process instead of testing the old one.

This can save substantial time for many teams, and it is also the hardest lever, because retiring a control feels like reducing coverage. It is the opposite, if the retirement is documented and risk based. Coverage is about the risk, not the count of controls. A program with 80 well scoped controls is stronger than a program with 120 controls, 40 of which no longer map to a live risk.

Record the retirement decision, the risk reasoning, and who approved it. That record is what makes the decision defensible to an external auditor and to the committee.

Lever 2: Test once, use the result in more than one place

Many controls are tested more than once for different purposes. Internal audit tests a control for the SOX program. The external auditor tests the same control for ICFR. A separate compliance team tests a similar control for another framework. Each test pulls its own sample, requests its own evidence, and writes its own file.

Where the objective, population, and period align, test once and share the result, with the reliance decision documented. The external auditor will still re-perform some work, as the standards require, and will still make their own judgment about competence and objectivity. But a shared test with a clear trail reduces duplicate requests to the business and duplicate work for the audit team.

The condition for sharing is re-performance. If the first test cannot be followed by someone who was not in the room, it cannot be shared. That is why Lever 2 depends on the file standard in Lever 5. Sharing a weak file does not save time. It creates a second round of questions.

Lever 3: Test the full population where the data allows it

For controls that leave system data, sampling is a choice, not a necessity. If the population is in an ERP system, if the attributes are clear, and if the test can be run against every item, test every item.

Full population testing removes sampling risk for that control, and it changes where the auditor spends time. Instead of pulling 59 items and testing each one by hand, the auditor reviews the exceptions the full test surfaced. That is faster, and it is also more complete, because the exception that would not have been sampled is now visible.

This lever has a limit, and it matters. Full population testing works for automated and system based controls, for matching, for approvals recorded in a system, for access logs, for duplicate checks. It does not work for a judgmental review control where the evidence is a conversation, or for a control where the population is not in a system. Do not force it where it does not fit. Use it where the data is already there.

When you use it, keep the sampling judgment. Define the population, define the attributes, set the threshold, and decide what counts as an exception, before you run the test. The tool runs the test. The auditor owns the definitions.

Lever 4: Define review control precision before testing starts

Review controls are a recurring source of ICFR findings, and they are also a frequent source of rework. The fix is to define precision before testing, not during review.

For each review control, write down four things before the test period starts. What report or information is reviewed, including the system, the version, and the date? What threshold triggers follow up, in numbers or in clear criteria? What does the reviewer actually check? What happens to exceptions, by whom, and by when?

If those four are written down, the test is straightforward. The auditor checks the report, the threshold, the follow up, and the resolution. If they are not written down, the test becomes an argument about what the reviewer meant to do, and the reviewer has to reconstruct intent months later.

This lever also helps the control owner. A reviewer with a clear threshold can do the review faster and with more confidence, because they know what to look for and what to escalate. Precision helps the business, not just the auditor.

Lever 5: Make the file re-performable by design, not by cleanup

A re-performable file is one that a competent reviewer can follow, step by step, without talking to the auditor who did the work. It shows the population, the procedure, the evidence, and the conclusion, with the evidence itself attached, not summarised.

Most teams try to achieve this by cleanup at the end. That is expensive, because cleanup requires remembering what was done weeks earlier. It is cheaper to build the file as the work happens: link the evidence to the test when it arrives, record the population when it is defined, and write the conclusion when the judgment is made, not at the end of the cycle.

A simple check helps. Before a file is marked ready for review, ask the reviewer to re-perform three tests from the file alone. If they can, the standard is working. If they cannot, note exactly where they stopped, and fix that gap in the template. Repeat the check next cycle. Over two or three cycles, that check does more for review time than any new checklist.

This lever also shortens the external auditor window. From December 15, 2026, the documentation deadline compresses from 45 days to 14 days. A file that needs reconstruction will not survive a shorter clock. A file that is already re-performable will.

Lever 6: Decide deficiencies on a ladder, at the time, not at year end

Deficiency evaluation is where SOX cycles stall at year end. Deviations accumulate, no one evaluates them until reporting, and then a set of small issues has to be judged under time pressure, with incomplete causes.

Use a ladder, and use it as deviations are found. The ladder in AS 2201 is based on magnitude and likelihood, with compensating controls considered, and with specific indicators of a material weakness, including senior management fraud, a restatement, a material misstatement the auditor found that ICFR did not catch, and ineffective audit committee oversight. A deficiency is evaluated on whether there is a reasonable possibility that a material misstatement will not be prevented or detected on a timely basis.

In practice, that means three steps for each deviation, done when it is found. First, what is the cause, and is it isolated or systemic? Second, what is the magnitude and likelihood, given compensating controls? Third, what is the rating, control deficiency, significant deficiency, or material weakness, and who agreed it?

Recording that decision at the time saves the year end debate, and it also improves the decision, because the cause is fresh and the evidence is in front of the auditor. A deficiency decided in March, with a clear cause, is easier to defend than one decided in January, from memory.

Lever 7: Close the loop on remediation, with a clear close criterion

Remediation is the longest tail in SOX testing. An action plan is agreed, then it lives in a report, then in a spreadsheet, then in an inbox. No one can see what is open, what is overdue, who owns it, and what evidence would close it. So the team retests the same issue next year, as if it were new.

For each action plan, write down the close criterion at the time the plan is agreed: what evidence would show this is fixed? Until that evidence arrives, the item stays open, visible, and owned. When it arrives, it closes with a trail.

Retesting should then test the fix, not repeat the original test in full. If the fix was a new approval step, test that the step operates. If the fix was a system block, test the block. Targeted retesting is faster and more convincing than repeating the whole control test because the action plan was vague.

How do you scope SOX testing by risk?

Scoping is where the time saving starts, and it is where the quality argument is won or lost. A risk based scope is not a smaller scope for its own sake. It is a scope that can be explained, control by control, in terms of misstatement risk.

Scoping questionWhat good looks likeWhat to avoid
What misstatement does this control address?Named misstatement, named account, named assertionA control with no misstatement, kept because it was there last year
How material is the risk?Materiality linked to the account and the assertionThe same sample size and confidence for every control, whatever the risk
Is there a duplicate?One control per risk, with the clearer evidence trail keptTwo controls testing the same risk, with two samples and two files
Has the process changed?Control updated to the current process, with the change documentedTesting the old process while the business runs the new one
What is the reliance?Reliance stated, with the confidence and tolerable rate that follow from itReliance assumed, with no link to sample size or testing depth

Work through that table for the control list once a year, before walkthroughs start. The output is a shorter list, with a reason for each control that remains and a reason for each control that was retired or moved out of scope. That output is the document the external auditor and the committee will ask for, and it is also the document that justifies the time saved.

How do you test review controls with precision?

Review controls deserve a section of their own, because they are a recurring theme in the PCAOB inspection results and a frequent source of rework in SOX testing.

A management review control is a control with a review element: a person reviews information and follows up on exceptions. The precision of that review is the control. A review with no stated threshold is not testable, because no one can say what would have caused the reviewer to act.

Before testing a review control, confirm that the file answers three questions. What was reviewed, exactly, including which report, which version, and as of which date? What would trigger follow up, in numbers or in clear criteria? What happened to the exceptions, including what was done, by whom, and when it was closed?

If the file answers those three, test the control by checking the report against the source system, checking the items above the threshold, and checking the resolution of every exception. If the file does not answer them, the work is not testing. It is reconstruction, and it should be sent back to the control owner to define the precision first.

AI can help at the reading stage here. It can check the report against the source, pull the full list of items above the threshold, and draft the summary of what was found. It cannot set the threshold, judge whether an explanation is credible, or decide whether a pattern across three months matters. Those judgments belong to the auditor and to the reviewer. The technology should make the precision visible, so the judgment can be applied to the right items.

What does a 90 day plan to cut SOX testing time look like?

A plan that tries to fix everything at once will fix nothing. A 90 day plan that fixes the biggest delay first will move the next cycle.

Days 1 to 30: Diagnose and scope. Trace five late controls from last cycle to the phase where they stalled. Work through the scoping table for the control list, retire duplicates and controls with no live misstatement, and record each retirement with its reasoning. Define precision for the top 10 review controls, with thresholds, reports, and follow up rules written down before testing starts.

Days 31 to 60: Fix the file and the evidence flow. Agree the file standard, with population, procedure, evidence, and conclusion in every file. Move evidence requests, evidence, and clarifications into one thread per control, so no one has to search email, a shared drive, and a chat to find the same item. Pick two controls where full population testing fits, and run them in full, with auditors reviewing only the exceptions. Record what that changed in reviewer time.

Days 61 to 90: Fix deficiency and remediation discipline. Agree the deficiency ladder and the rule that deviations are evaluated when found, not at year end. For every open action plan, add an owner, a due date, and a close criterion that names the evidence that would show the fix worked. Retest the fix, not the whole control, where the fix is targeted.

At the end of 90 days, measure three things, not one. Time from fieldwork completion to final report, number of review queries that required reconstruction, and number of controls retired or moved out of scope with documented reasoning. Those three tell you whether time fell because quality improved, or because steps were skipped. If review queries fell and the report date moved earlier, the levers worked. If time fell but review queries rose, a step was cut that should not have been.

Where is time saved, and where is it not?

  1. Scoping

    Save time here: retire controls that no longer address a risk.

  2. Evidence

    Save time here: move requests and evidence into one thread.

  3. Testing

    Save time here only where full population testing fits.

  4. Review

    Save time here: make files re-performable, so review is faster.

  5. Deficiency

    Save time here: evaluate deficiencies when found, not at year end.

  6. Reporting

    Reporting gets faster when the earlier stages are clean.

Do not save time in testing and review by shrinking samples, skipping attributes, or accepting a draft conclusion without review. That is not a saving. It is a deficiency that will be found later, at higher cost.

The substantial savings are upstream and downstream of testing, in scoping, evidence, review, and deficiency discipline, not in the test itself.

What should you not cut, even when time is short?

Four things should never be cut to save time, because cutting them creates the rework the program is trying to avoid.

Do not cut the design test. If the design is not sound, operating testing is wasted time.

Do not cut the population definition. A test without a defined population cannot be projected, cannot be shared, and cannot be defended.

Do not cut the deviation evaluation. A deviation recorded without a cause, an extent check, and a rating is an open item that will return at year end, with less time to judge it.

Do not cut the human review of AI output. If AI tested the population or drafted the finding, a human must still check the threshold, review the exceptions, and sign the conclusion. That review is the control that makes AI assisted testing defensible, and it is also the step that catches the error a full population test would otherwise repeat at scale.

These four are the floor. Everything else in the cycle is negotiable, and should be questioned every year.

A note on one customer outcome

One CoAuditor manufacturing customer completed six audits in one month with no new headcount, work that would have cost more than 300,000 dollars in outsourcing. The gain was not that auditors worked faster at testing in isolation. It was that the leaks around testing, the requests, the follow ups, the status work, and the rework, stopped taking the week. That is one customer, in one context, with its own control list and its own team. It is not a promise that any other team will save the same time, and it should not be read as one. Use it as an example of what changes when the workflow around testing is fixed, not as a forecast for your cycle.

What are the limits of cutting SOX testing time?

Cutting time by removing waste has a limit. After the waste is gone, the remaining time is the time the work actually takes: defining the population, testing the attributes, judging the exceptions, and writing a conclusion someone else can follow. That time cannot be cut without cutting quality, and it should not be tried.

There is also a limit that comes from the business itself. If controls change mid cycle, if a system is replaced, if a key owner leaves, testing will take longer, whatever the workflow. A plan that assumes a stable year will be wrong in an unstable year. The honest response is to rescope and replan, not to compress testing to fit the original date.

Finally, AI assisted testing does not remove the need for judgment, and it does not remove error. It can reproduce bias in the data it reads, and it can be confident about a wrong match. Human review is not a formality. It is the control that makes the approach defensible.

How CoAuditor helps

CoAuditor brings scoping, evidence requests, testing, deficiency evaluation, and remediation into one auditable trail, so the population, the evidence, the exceptions, and the conclusion stay linked, while Agentic AI tests full populations where that fits and drafts the first version of the work, and auditors own the scoping judgment, the thresholds, the deviation evaluation, and the final conclusion.

Sources

Frequently asked questions

Can we cut SOX testing time by reducing sample sizes?
You can reduce a sample only by changing the reliance decision that sets it, including confidence and tolerable rate, and documenting that change. Reducing a sample without changing reliance weakens the conclusion without saving the program. The safer savings are in scoping, evidence flow, and rework, not in sample size.
Does full population testing mean we no longer need sampling?
For the controls where full population testing fits, it removes sampling risk for that control, because every item is tested. It does not remove the need to define the population, set attributes and thresholds, and evaluate exceptions. For manual and judgmental controls, sampling is still the right approach, using the method in Article 13.
How do we know if a control can be retired from the SOX program?
Ask what misstatement it prevents or detects, how material that misstatement is, and whether another control already covers it. If there is no clear misstatement, or if a duplicate covers the same risk with a clearer trail, retire it with the reasoning, the risk assessment, and the approval recorded. If you cannot write that reasoning down, the control should stay until you can.
What should we do when a review control has no stated threshold?
Stop testing and define the threshold first, with the control owner. A review with no threshold is not testable, and testing it will produce a file that cannot be defended. Write down the report, the threshold, what the reviewer checks, and what happens to exceptions, then test operation against that definition.
How do we handle a deficiency found late in the cycle?
Evaluate it when it is found, using the ladder in AS 2201, with cause, magnitude, likelihood, and compensating controls considered. Do not wait for year end to judge it, and do not leave the rating open while reporting is drafted. A late deficiency judged promptly is easier to defend than one judged under reporting pressure.

Watch the 3-minute film

How internal audit keeps pace with AI-era risk, and what MJ does in a real audit, start to finish.

About the author

Ola Duduyemi

Ola Duduyemi is the co-founder and CEO of CoAuditor, a Certified Business Analysis Professional (CBAP) and a member of the IIA Toronto Chapter. Ola studied economics and built a career in internal audit.

Your seat is waiting.

Speak on our shows, bring an outside view, co-author an article or open doors. Pick a program:

See MJ work on your own audit in 30 minutes.