Planning and standards

What should a risk and control matrix include?

A risk and control matrix links each risk to the controls that address it, the owner, the test, and the evidence you need.

Ola Duduyemi, CBAP, CIA · Co-founder and CEO, CoAuditor

What every row of the matrix connects
1
RiskWhat could go wrong
2
ControlWhat stops or catches it
3
TestHow you prove the control works
4
EvidenceWhat the test is based on
Source: CoAuditor analysisCoAuditor

Short answer

A risk and control matrix links each risk to the controls that address it, the owner, the test, and the evidence you need. Start with one process, list its risks, map each risk to one or more controls, and note the design, the test, and the residual risk. Keep it short enough to review, and detailed enough to test from.

Key facts

  • The Global Internal Audit Standards took effect on January 9, 2025, with 5 domains, 15 principles, and 52 standards, and they expect audit work to be based on a documented risk assessment. IIA Global Internal Audit Standards
  • Standard 9.1 in the Global Internal Audit Standards addresses emerging risks, so a matrix that only covers last year risks will miss the risks that changed. IIA Global Internal Audit Standards
  • The IIA Cybersecurity Topical Requirement, issued February 5, 2025 and effective February 5, 2026, sets 17 requirements across three domains: governance, risk management, and control processes. IIA Topical Requirements
  • Digital disruption was named a top five risk by 69% of North American audit leaders in Risk in Focus 2026/2027, yet only 9% said internal audit fully covered it. IIA Risk in Focus 2026/2027; North America Risk in Focus 2026/2027, Exhibit 3.1
  • A manufacturing customer completed 6 audits in one month with no new headcount using CoAuditor, work that would have cost more than $300,000 in outsourcing, after replacing hand-built risk and control matrices with a shared, testable format. CoAuditor customer outcome, verified

What is a risk and control matrix?

A risk and control matrix, often called a RACM, is a table that links risks to controls for one process, one system, or one audit area. Each row is a risk. Each row shows what could go wrong, what control is meant to stop it, who owns the control, how you will test it, and what risk remains after the control.

It is not a risk register. A risk register lists risks for the whole organization. A matrix is narrower and more useful: it is the working document for one audit, and it should be detailed enough that another auditor can test from it without asking the author what they meant.

It is also not a control list. A list of controls without risks does not show whether the controls cover what matters. A matrix shows the link, and the gaps.

What columns should a matrix include?

Keep the columns to nine, and use the same columns every time. Consistency is what makes matrices comparable, reviewable, and testable.

ColumnWhat to put in itExample
Risk IDA short code, such as P2P-01P2P-01
RiskWhat could go wrong, in plain languageDuplicate payments are made and not detected
Risk ratingHigh, medium, or low, before controlsHigh
Control IDA short code, such as P2P-C01P2P-C01
Control descriptionWhat the control does, who does it, and whenThree way match of invoice, order, and receipt before payment
Control typePreventive or detective, manual or automated, key or non-keyPreventive, automated, key
Control ownerNamed role, not a teamAccounts payable manager
Test procedureHow you will test design and operating effectivenessRe-perform the match for a sample, and test the full population for duplicates
Residual riskWhat risk remains after the control, and the evidenceMedium, if the match is bypassed for urgent payments

Add two optional columns if your team needs them: evidence needed, and linked finding or issue. Do not add more. A matrix with 15 columns is a spreadsheet no one will read.

How do I build a matrix in five steps?

Use these steps for one process at a time. Do not try to build a matrix for the whole organization in one go.

  1. Define the process and its boundaries. Write one paragraph: where does the process start, where does it end, what systems does it use, and who is involved? If you cannot define the boundaries, the matrix will keep growing.
  2. List the risks. Interview the process owner, read prior findings, and review incidents. List what could go wrong at each step, in plain language. Aim for 8 to 15 risks for one process. Fewer than 8 usually means you missed something. More than 15 usually means you listed the same risk twice, or listed a cause instead of a risk.
  3. Map controls to risks. For each risk, list the controls that address it. One risk can have more than one control. One control can address more than one risk. If a risk has no control, record that as a gap, not as a blank cell.
  4. Assess design. For each control, ask: if this control worked as described, would it address the risk? If the answer is no, the design is weak, and testing it will not help. Record the design conclusion before you test operating effectiveness.
  5. Plan the test and the evidence. For each key control, write the test procedure and the evidence you need. State the population, the sample if you sample, and what counts as a pass. AI can draft this first version from the process documents and prior matrices you provide, and an auditor should review every row for accuracy, completeness, and judgment.

What does a good example look like?

Here is a short example for procure to pay, with three rows. It is simplified, but the shape is the shape to copy.

Risk IDRiskRatingControlOwnerTest
P2P-01Duplicate payments are made and not detectedHighSystem blocks duplicate invoice numbers, and a monthly duplicate payment report is reviewedAccounts payable managerTest the system block with duplicate test cases, and re-perform the monthly review for three months
P2P-02Payments are made for goods not receivedHighThree way match of invoice, order, and receipt before payment, with exceptions heldAccounts payable supervisorTest the match for a sample, and review all exceptions and their resolution
P2P-03A vendor bank change is made fraudulentlyHighBank changes need two approvals and independent verification with the vendorFinance directorTest all bank changes in the period, and verify the approval and verification evidence

Notice what the examples do not do. They do not list every control in the system. They list the key controls that address the highest risks, with a test that can be followed.

What are the most common mistakes?

Five mistakes account for most weak matrices:

First, risks written as controls. "No three way match" is not a risk. It is a missing control. The risk is "Payments are made for goods not received." Write the risk first, then the control.

Second, controls written as aims. "Payments are accurate" is not a control. It is a hope. A control names who does what, when, and how. "Three way match before payment" is a control. "Payments are accurate" is not.

Third, no owner. A control owned by "Finance" is owned by no one. Name the role, and confirm the owner agrees they own it. If the owner does not agree, the matrix is wrong, and that disagreement is useful to record.

Fourth, no test. A matrix that stops at the control description cannot be tested from. Every key control needs a test procedure, a population, and a pass criterion. If you cannot write the test, you do not understand the control well enough yet.

Fifth, no residual risk. A matrix that implies every risk is fully controlled is not credible. State what remains after the control, and whether that residual risk is acceptable. That is the judgment the committee needs.

How does a risk trace to its controls and tests?

Risk

Payments are made to vendors that do not exist

  • Control: New vendors are approved by procurement before any payment

    Test: Re-perform the approval for new vendors in the period, against the approval log

  • Control: Vendor bank detail changes are verified by a call back

    Test: Inspect call back evidence for every bank detail change in the period

Every risk needs at least one control, and every control needs a test. A risk with no control is a gap.

How do I use the matrix during testing?

Use the matrix as the test plan, not as a document you file and forget.

During fieldwork, work row by row. For each key control, record the test result and the evidence. If a control fails, record the finding in the same row, so the link from risk to finding stays visible. At review, the reviewer should be able to follow the matrix from risk to control to test to conclusion, without asking the auditor to explain it. After the audit, update the matrix with what you learned, so the next audit starts from the updated version, not from a blank page.

What is the honest limit of a matrix?

A matrix is only as good as the understanding behind it. It can look complete and still miss a risk, because no one in the room knew the risk existed. It can map controls neatly and still miss that a control is bypassed in practice, because the matrix describes the design, not the behaviour.

That is why a matrix needs interviews, walkthroughs, and observation, not only documents. AI can draft a matrix from documents, but it cannot walk a process or notice that the control described in the procedure is not the control used in practice. That observation is the auditor work.

How CoAuditor helps

CoAuditor keeps the risk and control matrix, evidence, testing, and findings in one place, so the matrix is the test plan and the trail, with Agentic AI drafting the first matrix from process documents and prior work, while auditors own the risks, the controls, the design judgment, and the conclusions.

Sources

Frequently asked questions

How long should a matrix be?
For one process, 8 to 15 risks is a useful range. If you have more than 20 rows, split the process, or check whether you listed causes instead of risks.
Should every control be key?
No. Mark only the controls that address a high risk, or that the audit will rely on, as key.
Can AI write the matrix for me?
AI can draft it from documents you provide, and it can flag gaps, such as a risk with no control. An auditor must review every row, confirm the owner, and own the design judgment before testing starts.
How often should a matrix be updated?
Update it after each audit of the process, and when the process, system, owner, or regulation changes.
What if a risk has no control?
Record it as a gap, rate the residual risk, and report it.

Watch the 3-minute film

How internal audit keeps pace with AI-era risk, and what MJ does in a real audit, start to finish.

About the author

Ola Duduyemi

Ola Duduyemi is the co-founder and CEO of CoAuditor, a Certified Business Analysis Professional (CBAP) and a member of the IIA Toronto Chapter. Ola studied economics and built a career in internal audit.

Your seat is waiting.

Speak on our shows, bring an outside view, co-author an article or open doors. Pick a program:

See MJ work on your own audit in 30 minutes.