Why do review controls keep failing inspection?

The PCAOB keeps finding the same ICFR failures: review controls, control selection, and deficiency evaluation. The fix starts with precision, thresholds, follow up, and evidence you can show.

Ola Duduyemi, CBAP, CIA · Co-founder and CEO, CoAuditor

Inspected audits with a Part I.A deficiency
202346%
202438%
202523%
Source: PCAOB, Staff Update on 2025 Inspections (estimates)CoAuditor

Short answer

A review control fails when its precision cannot be shown. The reviewer may be diligent, but if no threshold, source report and follow up are recorded, no one can tell whether the control worked. Fix the design first: write the threshold down, attach the exact report, and record every exception and its resolution. Then test it.

Key facts

Why does the same finding come back every year?

Every year, the same finding comes back. Not a new risk, not a new system, the same one.

The PCAOB inspection update of October 22, 2026 reported that the share of integrated audits with at least one ICFR deficiency fell from 27 percent to 14 percent. That is real progress. It also reported that the recurring problem areas did not change: controls with a review element, identifying and selecting controls to test, and evaluating identified deficiencies.

In plain language: we are getting better at testing, and we are still failing at the same three places.

The first of those three deserves more attention than it gets. Management review controls are where internal control over financial reporting most often breaks, and they break for a reason that has nothing to do with effort. They break on precision.

What is a management review control, really?

A management review control is simple to describe and hard to do well. A person reviews information, a report, a reconciliation, an analysis, and follows up on exceptions.

The control is not the review meeting. It is not the signature. It is the precision of the review: what threshold triggers follow up, what the reviewer actually looks for, and how exceptions are resolved.

A review with no stated threshold is not testable. If no one can say what would have caused the reviewer to act, then no one can say whether the control worked. The reviewer may be diligent, experienced, and honest, and the control may still fail, because diligence is not a threshold.

This is why review controls produce so many findings. The work happened. The evidence that it happened with precision did not.

ElementWeak versionPrecise version
What was reviewedThe monthly reportThe named report, version, date, and source system
ThresholdMaterial items were investigatedItems above a stated amount or outside a stated range require follow up
Follow upExceptions were notedEach exception shows what was done, by whom, and when it closed
EvidenceA signature on a summaryThe source report attached, with the reviewer notes tied to it

What three questions should every review control answer?

Before you test a review control, ask whether the file answers three questions. If it does not, the test will be an argument, not an assessment.

  1. What was reviewed, exactly? Not "the monthly report." Which report, which version, as of which date, from which system? If the information used in the control comes from a system generated report, the accuracy and completeness of that information is part of the control. A reviewer cannot catch an error in data they never validated.
  2. What would trigger follow up? A threshold, in numbers or in clear criteria. Above this amount, below this rate, outside this range, follow up is required. Vague language like "material items were investigated" is not a threshold. It is a hope.
  3. What happened to the exceptions? Every exception found, what was done, by whom, and when it was closed. An exception with no resolution is an open control failure, even if the reviewer noticed it. Noticing is not resolving.

If your team can answer those three questions from the workpaper, without calling the reviewer to reconstruct it, the control is in good shape. If it cannot, the problem is not the reviewer. It is the design of the evidence.

  1. 1Source report
    • Name
    • Version
    • Date
  2. 2Review against a stated threshold
    • Items above the threshold pulled into a list
  3. 3Each exception resolved
    • Resolution
    • Owner
    • Close date

If any step is missing, the control cannot be tested. Precision is a chain, and a missing link breaks it.

Where does AI help, and where does it not?

This is a good place to be specific about human AI collaboration, because review controls show the division clearly.

AI is useful at the reading stage. It can check the report against the source system, flag where the numbers do not tie, pull the full list of items above the threshold, and draft the summary of what was found. That is scale work, and it is work that eats testing hours when done by hand.

AI cannot set the threshold. It cannot decide whether a follow up explanation is credible. It cannot judge whether an exception matters in context, or whether a pattern across three months means something a single month does not.

That judgment belongs to the auditor, and to the reviewer. The technology should make the precision visible, so the judgment can be applied to the right items, with the full evidence in front of the person making the call.

The risk is when the order reverses: AI drafts a conclusion, and a human signs it without checking the threshold or the exceptions. That is faster, and it is worse. Speed without precision is how a review control passes on paper and fails in inspection.

How do you test your review controls next cycle?

Pick five review controls from your current plan. For each one, try to answer the three questions above from the workpaper alone, in under ten minutes per control.

  1. Open the file cold, with no help from the auditor who did the work. Can you find the exact report, version, and date?
  2. Can you state the threshold in one sentence, without interpretation?
  3. Can you list every exception and its resolution, owner, and close date?

If you can, your testing is in good shape. Keep going.

If you cannot, you have found the work for next cycle, and it is not more testing. It is better design: write the threshold into the control description, require the source report to be attached with its date and version, and require every exception to carry a resolution and a close date.

That is unglamorous work. It is also the work that moves the inspection themes. The PCAOB findings are not asking for more effort. They are asking for precision that can be shown.

The shorter documentation clock adds urgency. From December 15, 2026, the external auditor has 14 days, not 45, to complete documentation after the report release date. A file that needs reconstruction will not survive a shorter clock. A file that already answers the three questions will.

What is the honest limit?

Precision does not guarantee a control is effective, and a precise test of a poorly designed control still fails. A tight threshold on the wrong report is still the wrong control. Precision makes the test honest. It does not replace the design judgment about what should be reviewed in the first place.

That judgment is the auditor's work, and it always will be.

How CoAuditor helps

CoAuditor brings planning, evidence, testing, findings, and reporting into one auditable trail, with Agentic AI that tests controls at scale while auditors own the judgment on thresholds, exceptions, and conclusions. If you want to see how review control precision looks when the evidence trail is built in, book a 30 minute intro call.

Sources

  • PCAOB, Staff Update on 2025 Inspections of Public Company Audits, October 2026. Read the Spotlight
  • PCAOB, AS 2201, An Audit of Internal Control Over Financial Reporting That Is Integrated with An Audit of Financial Statements. Read AS 2201

Frequently asked questions

What is a management review control?
A control where a person reviews information, such as a report or reconciliation, and follows up on exceptions. Its strength is its precision: the threshold, what was reviewed, and how exceptions were resolved.
Why do review controls fail so often?
Because the review happened but its precision was not recorded. Without a stated threshold, a named source report, and a resolution for each exception, a tester cannot tell whether the control worked.
Can AI test a review control?
AI can help at the reading stage: checking the report against the source, pulling items above the threshold, and drafting a summary. It cannot set the threshold or judge whether an explanation is credible. Those are human decisions.
What is the quickest check for our next cycle?
Take five review controls and try to answer the three questions from the workpaper alone in under ten minutes each. Where you get stuck, fix the template, not the whole methodology.
Does precision matter if the control design is wrong?
No, not on its own. A precise test of the wrong control still fails. Precision makes testing honest. Design judgment decides what should be reviewed in the first place.

Watch the 3-minute film

How internal audit keeps pace with AI-era risk, and what MJ does in a real audit, start to finish.

About the author

Ola Duduyemi

Ola Duduyemi is the co-founder and CEO of CoAuditor, a Certified Business Analysis Professional (CBAP) and a member of the IIA Toronto Chapter. Ola studied economics and built a career in internal audit.

Your seat is waiting.

Speak on our shows, bring an outside view, co-author an article or open doors. Pick a program:

See MJ work on your own audit in 30 minutes.